Ready-Mix vs Bagged Concrete Cost Calculator
Take this from whichever calculator gave you the volume.
Bag mixing rate scales with hands. Ready-mix does not care.
Result
Loading…
The honest answer to "bags or a truck" is a number, and it moves with your volume, your local short-load fee and how many people you can put on shovels. Below about a cubic yard bags almost always win; above a pallet they almost never do. This prices both against your own figures and tells you what the cheaper option costs in hours.
Assumptions used
These are the numbers behind the result. Where one of them is soft, the cost range widens rather than pretending to a precision the data does not have.
- 80 lb bag yield
- 0.6 ft³
- 60 lb bag yield
- 0.45 ft³
- Ready-mix short-load threshold
- 1 yd³
- Bags per pallet
- 42 bags
Yield of one 80 lb bag of standard concrete mix.
Quikrete product data sheet — Published product data, checked 09/01/2026
Yield of one 60 lb bag of standard concrete mix.
Quikrete product data sheet — Published product data, checked 09/01/2026
Below roughly one cubic yard, most suppliers add a short-load fee that erases the price advantage over bags.
Regional ready-mix supplier schedules — Rough figure — widens the estimate range, checked 09/01/2026
Above roughly one pallet of 80 lb bags, ready-mix is usually cheaper and always faster.
Home Depot / Lowe's pallet quantities — Industry standard, varies by supplier, checked 09/01/2026
Prices verified 09/01/2026 (US national average, big-box retail shelf price and regional ready-mix quotes). Regional adjustment: Blended from RSMeans city cost index bands and BLS construction wage differentials.
The formula
Bag count = volume in cubic feet ÷ bag yield, rounded up. Ready-mix cost = the greater of your volume or the supplier minimum, times the yard price, plus a short-load fee if you are under the minimum. Mixing time assumes about four minutes per bag per person, working steadily.
Worked examples
Half a yard for footings
Concrete needed (cubic yards): 0.5 People mixing: 2 Waste: 10
About 25 bags and an hour of mixing for two people. The short-load fee makes ready-mix uncompetitive at this size — this is exactly what bags are for.
One and a half yards for a shed slab
Concrete needed (cubic yards): 1.5 People mixing: 2 Waste: 10
The crossover zone. Around 75 bags is five hours of mixing for two people, against one truck that arrives and leaves in forty minutes.
Five yards for a patio
Concrete needed (cubic yards): 5 People mixing: 3 Waste: 10
About 248 bags — six pallets. Ready-mix wins on price and wins overwhelmingly on time. Nobody should bag five yards.
Choosing materials
- The short-load fee is the whole story on small pours. It is often $100 to $200, which on a half-yard pour more than doubles the cost of the concrete itself.
- Mixing rate is the number people underestimate. Four minutes a bag sounds slow until you have done forty of them, and it does not include the wheelbarrow trip.
- Bagged mix and ready-mix are not the same product. Ready-mix is ordered to a specified strength and can be air-entrained for freeze-thaw; bagged mix is what it is.
- A truck gives you a continuous pour. Bags mixed in batches over hours risk cold joints, which is a permanent weak plane in the concrete.
- 80 lb bags cost less per cubic foot than 60 lb. If you are working alone or lifting into a trench, the 60 lb bag is often worth the premium anyway.
Common questions
When is ready-mix cheaper than bags?
Usually above about one cubic yard, once the volume covers the delivery or short-load charge. Below that the fixed fee dominates and bags win. Enter your own volume above to see where the line falls with local prices.
What is a short-load fee?
A charge ready-mix suppliers add when you order less than their minimum, typically one cubic yard. It compensates them for sending a truck that comes back mostly full, and it commonly runs $100 to $200 on top of the concrete.
How many bags of concrete in a cubic yard?
Forty-five 80 lb bags, or sixty 60 lb bags. That is 3,600 lb of material either way, which is worth picturing before you commit to carrying it.
How long does it take to mix a pallet of concrete?
A pallet of 80 lb bags is 42 bags, about three hours for two people working steadily with a mixer, and considerably longer by hand in a tub. That estimate assumes nothing goes wrong and nobody stops.
Can I mix bags and ready-mix on the same pour?
You can, but do not plan to. Different mixes reach strength differently and the joint between them is a weak plane. Keep bags as a backup for a small overage, not as a supplement to a short order.
Does bagged concrete reach the same strength as ready-mix?
Standard bagged mix reaches about 4,000 psi at 28 days when mixed correctly, which is comparable to a typical residential ready-mix order. The difference is consistency: a truck mixes to a spec, and a homeowner adding water by eye does not.
Related calculators
- 20x20 Concrete Slab Cost Calculator
Concrete, base and cost for a 20 by 20 foot slab.
- Concrete Slab Cost Calculator
Concrete volume, bag count and slab cost.
- Concrete Truck Load & Short-Load Fee Calculator
Truck count, short-load fees and total delivered cost.
- 24x24 Garage Slab Concrete & Cost Calculator
Concrete, base and cost for a two-car garage slab.
- Concrete Driveway Cost Calculator
Concrete, base and cost for a driveway slab.
- Concrete Patio Slab Cost Calculator
Concrete, base and cost for a patio slab.